Detailed description of project
The main works executed are the main design, construction and supervision of Filter station water supply system Vrutok- Gostivar
Main design left supply and return pipelines
L = (156 +130) m F500 mm PE100 AG10 bar
-basic Right design for supply and return pipelines
L = 2 * 790m f280 mm PE 100 AG10 bar
Overall project value: 286,390 €
Implementing period: 04/2012 – 12/2015
Type of services provided
- Control of permits, licenses and standards
- Health and safety control
- Compliance with environmental protection requirements;
Supervision of the construction works