Main design, construction and supervision of filter station water supply system Vrutok- Gostivar

Detailed description of project

The main works executed are the main design, construction and supervision of Filter station water supply system Vrutok- Gostivar

Main design left supply and return pipelines

L = (156 +130) m F500 mm PE100 AG10 bar

-basic Right design for supply and return pipelines

L = 2 * 790m f280 mm PE 100 AG10 bar

Overall project value: 286,390 €

Implementing period: 04/2012 – 12/2015

 

Type of services provided

  • Control of permits, licenses and standards
  • Health and safety control
  • Compliance with environmental protection requirements;

Supervision of the construction works