MEPSO: Macedonia – Albania High Voltage Electricity Transmission, Phase 1

High-voltage transmission line and smart grid development between Macedonia-Albania, overall project value: €1,804,085.

TASK I. Project Preparation Phase

Development of PIU operating procedures
Support during the procurement process in accordance with EBRD rules
Support during the bids evaluation process
Support during contract finalization


TASK II. Project Implementation Phase

Preparation of technical documentation and specifications and technical design of equipment;
Site supervision, monitoring and reporting;
Health and safety supervision;
Preparation of Environmental Impact Assessment (EIA) study;
Preparation of Social Impact Assessment study;
Testing, commissioning and operational acceptance of equipment and plant;
Project Completion report.


TASK III. Smart Grid

Commissioning and Operational Acceptance
Environmental and Social Action Plan
Knowledge transfer to Client
The Macedonian Electricity Transmission System Operator (MEPSO) received a loan from the European Bank for Reconstruction and Development (EBRD) and grant funds provided by Western Balkans Investment Framework (WBIF) and Luxemburg to implement a high violate (400 kV) electricity transmission line between Macedonia and Albania.

The Project seeks to support MEPSO in the construction of the Macedonian portion of the planned 400 kV cross-border electricity interconnection with Albania, the first interconnection between the two countries, and the introduction of Smart Grid Efficiency Improvements to the MEPSO’s infrastructure. The Project will provide crucial cross-border infrastructure, delivering transition impact through the expansion of competitive market interactions and setting standards for corporate governance and business conduct.

The Project has a total estimated cost of about EUR 49 million and includes the supply and installation of equipment, implementation of works and provision of services as follows:

Construction of a new single circuit 400 kV overhead transmission (“OHTL”) line from the Bitola 2 Substation (“B2 SS”) to Ohrid Substation (“Ohrid SS”);
Construction of a new single circuit 400 kV OHTL from Ohrid substation to the connection point at the Macedonian – Albanian border;
Construction of a 400/110 kV substation in Ohrid;
Unbundling and construction of 110 kV connections;
Extension of the B2 Substation for new OHTL bay to Ohrid;
Implementation of Smart Grid Efficiency Components as (i) The upgrading of a Supervisory Control and Data Acquisition System (SCADA); (ii) Hardware and software for energy forecasting for renewable power plants; (iii) Automated Demand Response; (iv) Implementation of Wide Area Monitoring System (WAMS); and (v) Study for the effects of Plug-in Electrics Vehicles (PEV) on the Transmission Grid in Macedonia;
Project management services.

Project Details

Client
Macedonian Electricity Transmission System Operator (MEPSO)
Country
North Macedonia
Funding
European Bank for Reconstruction and Development (EBRD)
Year
01/2019 – 12/2022