Reference No. 10

Ashta Hydropower Plant, Drin River Funded by: VERBUND AG Austria Client: VERBUND AG Austria Overall project value: 129.456€ Country: Albania Implementing period: 11/2010 – 01/2009 The main objective of this project is preparation of the CDM project according to UNFCCC requirements.   Data collection of grid generation and grid outages; Priority data collection of bigger […]

Reference No. 9

Development of Electricity Distribution System in the North-eastern Region of the Republic of Macedonia Funded by: EVN Macedonia (Electricity Distribution System Operator) Client: EVN Macedonia (Electricity Distribution System Operator) Overall project value: 50.000€ Country: Macedonia Implementing period: 01/2012 – 12/2012   Detailed description of project The Project sought to develop a 10-year electricity distribution network[…..]

Reference No. 8

Technical Due Diligence to the Tender Documentation for construction of Boskov Most HPP Funded by: Powerplants of Macedonia (ELEM) Client: Powerplants of Macedonia (ELEM) Overall project value: 8.000 Country: Macedonia Implementing period: 01/2011 – 04/2011   Detailed description of project Overall objective – Technical Due Diligence to the Tender Documentation for construction of Boskov Most[…..]

Reference No. 7

Kosovo Transmission Development Project – Consultant for the Project Preparation Support Funded by: European Bank for Reconstruction and Development (EBRD) Client: Kosovo Transmission System Operator (KOSTT) Implementing partners: MVV Decon (Germany) Overall project value: 159.700 € Country: Kosovo Implementing period: 08/2015 – 03/2016   Detailed description of project The project has the main objective is[…..]